Line 1 | Line 2 | |
---|---|---|
Unplanned Downtime | -29% | -26% |
Mean Time Between Failure | +52% | +81% |
“
”We are able to focus with the operators on doing things right [and] being excellent in what we do. Poka is actually a very good carrier of this mindset.
Number of shift handover form completions | +10% | |
---|---|---|
Number of inspections | +50% |
“
”Poka is all about standards. I think Poka is a natural extension to what we do in continuous improvement.