Bunge

Reducing Unplanned Downtime and Streamlining Shift Handovers at Bunge

Boost Asset Performance Skills Management Forms & Checklists
880x526 Bunge
Bunge Poka1

Production Line Improvements

Line 1 Line 2
Unplanned Downtime

-29%

-26%

Mean Time Between Failure

+52%

+81%

We are able to focus with the operators on doing things right [and] being excellent in what we do. Poka is actually a very good carrier of this mindset.

Bunge

Marcin Szczelkun

Continuous Improvement Director for Europe & Asia

Bunge Poka2

Shift Handover and Inspection Improvements

Number of shift handover form completions

+10%

Number of inspections

+50%

Poka is all about standards. I think Poka is a natural extension to what we do in continuous improvement.

Bunge

Marcin Szczelkun

Continuous Improvement Director for Europe & Asia

Bunge Poka3